Planned water supply maintenance for 18 to 26 March
16 March 2024
The City’s Water and Sanitation Directorate will be doing planned work in the identified areas, which will result in water supply disruptions.
Maintenance work, including pipe, valve and meter installations, repairs and replacements will result in water supply disruption to these areas:
Helderberg and Southern Suburb areas
The pipeline from the Upper to the Lower Blackheath Reservoir will be shut down from 06:00 on Monday, 18 March 2024 until 18:00 on Wednesday, 20 March 2024. This will enable the maintenance team to safely do a 1 500mm diameter water meter replacement on this pipeline. The relevant reservoirs will be filled in advance to maintain the water supply to the Helderberg and Southern Suburbs. Residents in these areas are however kindly requested to reduce their water consumption during this period to sustain the water supply and pressure.
Manenberg
The maintenance team will be installing a 200mm diameter water meter on the water supply main in Downs Way, Manenberg from 10:00 until 16:00 on Tuesday, 19 March 2024. Alternate water supply will be rerouted to the area and will result in lower than usual water pressure.
Victorskloof
The maintenance team will be installing a temporary bypass on the water supply main to Victorskloof, Surcingle, Almond and Monterey Roads in Hout Bay as part of the pipe replacement project in the area. This will require that the water supply to these roads and immediate surrounds be shut off from 09:00 until 17:00 on Wednesday, 20 March 2024 to enable the work to be done safely.
Philippi, Browns Farm, Marcus Garvey and Schaapkraal
The maintenance team will be replacing a 500mm diameter water meter insert on the water supply main in Govan Mbeki Drive, Manenberg from 10:00 until 16:00 on Tuesday, 26 March 2024. This will require that the water supply to these areas be shut off during this period to enable the work to be done safely.
This work forms part of the Water and Sanitation Directorate's proactive infrastructure maintenance and upgrade programme which ensures the future continuity of water supply by addressing the issue of unaccounted for water.
The City sincerely regrets any inconvenience caused.
What residents need to know about larger-scale planned water supply disruptions:
For updates on the maintenance work (and location of tankers where applicable), follow @CityofCTAlerts which is a City of Cape Town X account (formerly Twitter).
How residents are advised to prepare for planned water supply disruptions:
|
End
Published by:
City of Cape Town, Media Office