Planned water supply maintenance for 15 to 18 April
14 April 2024
The City’s Water and Sanitation Directorate will be doing planned work in the identified areas, which will result in water supply disruptions. The City sincerely regrets any inconvenience caused. This critical work is done on our water supply infrastructure to benefit customers. Residents in the affected areas are encouraged to take note of the work that will take place and prepare accordingly.
City-wide notice of maintenance work to be done by the National Department of Water and Sanitation
Residents across the city requested to reduce water consumption
The National Department of Water and Sanitation (DWS) will be doing pumping tests from the Berg River to the Riviersonderend Tunnel which supplies the Faure and Blackheath Water Treatment Plants (WTPs). During these tests, the supply to Faure and Blackheath will be reduced from Monday morning, 15 April 2024, until the evening of Tuesday, 16 April 2024. The City is topping up its reservoirs prior to the DWS shutdown.
DWS will fill its buffer dam, the Kleinplaas Dam, in advance to sustain the water supply to the Faure and Blackheath Water Treatment Plants, however at a reduced rate. Drinking water production from these two water treatment plants, which supply water to a large part of the city will be reduced to approximately half their daily output.
This may result in a temporary reduction of water pressure in some parts of the city.
Residents across Cape Town are kindly requested to reduce their water consumption to ensure the provision of a sustainable water supply during the shutdown period.
The City sincerely regrets any inconvenience caused, but it is imperative that DWS maintains its bulk water supply infrastructure to benefit its stakeholders.
Maintenance work, including pipe and valve installations, repairs and replacements will result in water supply disruption to these areas:
Published by:
City of Cape Town, Media Office