Far South showcases new Kommetjie Road
17 August 2020
This project is one of the City’s congestion management interventions, and was recently completed after nearly four years.
Caption 1: The Kommetjie Road Project commenced in October 2016 and was completed last month at an investment of approximately R256 million. A very important aspect of the project was the creation of safe facilities for pedestrians and cyclists as can be seen in the photo. There are now walkways for pedestrians along Kommetjie Road and Ou Kaapse Weg as many residents from this area walk to their destinations..
Caption 2: All-in-all the Kommetjie Road Project entailed roadworks covering a distance of approximately 3,5 km. It included, among others, the upgrade of Kommetjie Road (M65) to a four-lane dual-carriageway between Capri Drive and Corsair Way, and the rehabilitation of the existing roadway; the upgrade of Ou Kaapse Weg (M6) to a four-lane dual-carriageway between Noordhoek Main Road and Kommetjie Road, and the rehabilitation of the existing roadway; the upgrade of the intersection at Ou Kaapse Weg and Silvermine Road to improve the sight distance for road users; and the upgrade of the four signalised intersections with additional turning lanes to improve the capacity and flow of traffic at Kommetjie Road and Capri Drive; Kommetjie Road and Ou Kaapse Weg; Ou Kaapse Weg and Buller Louw Boulevard; and at Ou Kaapse Weg and Noordhoek Main Road.
Also, some of the plants road users will notice along the roads and at the islands are 100 exotic non-invasive gum trees, 650 indigenous trees, and 500 indigenous shrubby trees; 5 000 indigenous shrubs; 50 000 indigenous groundcover plants; and sour fig cuttings.
End
Published by:
City of Cape Town, Media Office