Menu

City advises of planned water supply maintenance in Welgedacht Estate

2 August 2023

​The City’s Water and Sanitation Directorate will be doing planned work in the identified area, which will result in water supply disruptions.

Maintenance work – Pipe and valve installations, repairs and replacements

  • Welgedacht Estate
The water supply main to this area will be shut-off from 08:00 until 16:00 on Thursday, 3 August 2023 to enable the maintenance crew to safely connect a pressure reducing valve (PRV) on the pipeline. This will result in the disruption of the water supply to the area for the duration of the work.
 

The City sincerely regrets any inconvenience caused.
 

What residents need to know about larger-scale planned water supply disruptions:

  • Careful consideration has been given to the planning of this work to ensure it is being done at a time that is least disruptive to the water supply.
  • All sites where water and sanitation repairs and upgrades are conducted are deemed to be construction sites and, as such, are off-limits to members of the public.
  • Sometimes the maintenance work can be more complex than anticipated, which means the work could take longer.
  • For a short period after the supply has been restored, the water may be discoloured or look milky. This is because of trapped air in the pipes. If left to stand in a glass, the appearance will become clear, like normal.

For updates on the maintenance work (and location of tankers where applicable), follow @CityofCTAlerts which is a City of Cape Town Twitter account.

How residents are advised to prepare for planned water supply disruptions:

  • Store enough water in clean, sealed containers for use during this period.
  • Keep your taps closed to prevent any water loss and/or damage when the water supply is restored.


End

Published by:
City of Cape Town, Media Office